Date code work is No. 1 priority
Education's Pauline Lynch coordinates the collection of data, abstracts, journal articles, dissertations, statistical reports and case histories on educational topics for the Education Resources Information Center database. The Ask ERIC database resides on a 167-MHz Sun Microsystems Ultra HPC 3000 server with 256M of RAM, a 36G hard drive and 30G of RAID storage. Users can visit Ask ERIC on the Web at http://www.aspensys.com/eric. Related articles Major programs Who's In Charge
Educations Pauline Lynch
coordinates the collection of data, abstracts, journal articles, dissertations,
statistical reports and case histories on educational topics for the Education Resources
Information Center database. The Ask ERIC database resides on a 167-MHz Sun Microsystems
Ultra HPC 3000 server with 256M of RAM, a 36G hard drive and 30G of RAID storage. Users
can visit Ask ERIC on the Web at http://www.aspensys.com/eric.
Related articles
| Major programs | |
| Whos In Charge | |
| Top Contractors | |
| Getting info out is centers focus | |
| Department consolidates its old financial systems Nina Winkler was recently appointed the Education Departments Before moving to OPE, Winkler served as deputy director of the departments Winkler has a bachelors degree from Lynchburg College in Virginia, a GCN caught up with Winkler between meetings to discuss the best way to ready the WINKLER: Our overriding goal is to We are in a somewhat unique situation, since we run several large student loan We also have some unique data exchanges that are not common to other businesses. We exchange data with entities outside the department and among our own systems. We We have divided our systems into three categories: mission-critical systems, We meet every week to track each one of the 14 mission-critical systems. If there is a We are replacing noncompliant PCs, upgrading software, and making sure the staff is We are also working on systems you might not think of as important. For example, we are More than half our systems are past the renovation phase and into the validation phase. Most of the implementation will be done by the end of January. And as each week goes Its modest progress, but gratifying. We expect to move up even further in the |
NEXT STORY: People



